Firefighting contingencies are launch specific and are coordinated as part of the comprehensive launch safety planning process. As part of this process, a fire mitigation plan will be developed to address risks associated with launch failures. For both vertical and horizontal launches, the flight path will carry the rocket immediately over water, minimizing risk of forest fires near the launch site.